Hello, welcome to visit Jiangsu Haixin shipping Heavy Industry Co., Ltd. website!
Language:中文 English
Wonderful content loading
1 2 34

Repairs and maintenance work is over, “Haihong Engineering Ⅱ     DATE: 2016-12-23 16:08:31    The author:本站

August 22, completed the layout operations in Zhangjiagang, “Haihong Engineering Ⅱ” returned to Haixin HI for repairs and maintenance. “Haihong Engineering II” is an engineering layout ship with total length of 72m and tonnage of 1356dwt, mainly on the body laying work in the coastal regions. The conservation was mainly on equipment repairs and function improvements, to strength the capacity of its construction. It is reported that the maintenance work will be basically completed on September 2. Then “Haihong Engineering II” will go to Zhenjiang to accept new engineering tasks.

PREVIOUS:The project of 4500m3/h cutter suction dredger is moving for
NEXT:"MD 100" berthed at the outfitting dock of Haixin HI to do t

Copyright 2016-2019 Jiangsu Haixin shipping Heavy Industry Co., Ltd. all rights reserved 蘇ICP備10223514號(hào)-1
Hotline:0513-82181366 E_mail:jiangsuhaixin@jshxship.com
Adress:Number 3006 Xianggang Road,Binjiang Street,Haimen City,Jiangsu Province

ONLINE
TOP